The new Cure It EVO System has been designed for application on DIRECT TO FOIL BACKED INSULATION BOARDS.
Installation is quicker and more cost effective than the traditional method for installing GRP warm roofs.
The new Cure It EVO System has been designed for application on DIRECT TO FOIL BACKED INSULATION BOARDS.
Installation is quicker and more cost effective than the traditional method for installing GRP warm roofs.
Flat Roofing Supplies

Cure It EVO is an easy to use system: simply fit the insulation, apply EVO Primer direct to foil backed insulation, apply, EVO Basecoat, and then apply the Topcoat to finish.

Cure It EVO Primer has been specially formulated to bond directly onto foil backed insulation boards. This means that you no longer need a timber deck on insulation when installing a warm roof, saving you the cost and labour time of installing an entire OSB deck.

Cure It EVO Basecoat and Reinforcement Mat form a durable laminate. The Basecoat is easy to apply and forms the laminate that is durable, creating a hard wearing waterproof surface.

To complete the roof installation, Cure It Topcoat (available in various colours) is applied to provide an extreme UV resistant finish. Download the installation instructions

Cure It EVO is an easy to use system: simply fit the insulation, apply EVO Primer direct to foil backed insulation, apply, EVO Basecoat, and then apply the Topcoat to finish.

Cure It EVO Primer has been specially formulated to bond directly onto foil backed insulation boards. This means that you no longer need a timber deck on insulation when installing a warm roof, saving you the cost and labour time of installing an entire OSB deck.

Cure It EVO Basecoat and Reinforcement Mat form a durable laminate. The Basecoat is easy to apply and forms the laminate that is durable, creating a hard wearing waterproof surface.

To complete the roof installation, Cure It Topcoat (available in various colours) is applied to provide an extreme UV resistant finish. Download the installation instructions

Flat Roofing Supplies

NO DECKING BOARDS REQUIRED


  • Only a single sub deck required
  • No OSB deck required on top of insulation boards
  • Sub deck can be any structural wood boards
Roofing Supplies

LOWER COSTS


  • Standard insulation fixings and ply-decking can be used in build-up.
  • Only one decking layer required.
  • 20% cheaper material cost.
Flat Roofing Supplies

EASIER FITTING


  • Less specialised installation process.
  • Uses more standardised components.
  • Simplified trim installation.
Flat Roofing Supplies

QUICKER INSTALLATION


  • Over 50% fewer fixings required.
  • Reduces warm roof installation time by over 20%.
  • Decking and insulation build-up can be installed by 3rd party joiners/builders.
cure it evo
Cure It EVO has been designed for application direct to foil backed insulation, removing the need for a OSB board deck.


- Suitable structural wood boards used for the subdeck (OSB/Ply wood).
- Vapour Control Layer required to prevent condensation build up.
- Foil backed insulation boards (120mm) fixed to the subdeck using suitable mechanical fixings and washers (provided in kit box).
- 50mm Aluminium foil tape used to secure trims to the insulation (no requirement for clout nails).
- Apply Cure It EVO Primer direct to foil backed insulation boards.
- Apply Cure It EVO Basecoat with 450g per metre square Reinforcement Mat.
- Finish with Cure It Topcoat.

Cure It EVO Installation Video
The Cure It EVO installation video provides an overview of the installation process.


Cure It EVOInstructions

Cure It EVO Video Tutorial

 

Technical Support
For further information please contact our Technical Support team on 0877598376 or email sales@grpconnaught.ie